16 Sep, 2021 System Release 4.3.1-35
Changes and Updates (Effective 16 Sep 2021)
Extended
functionality
- Deploy CR
[D0113-5] Key Document Linked to Milestone
WebCert now provides the ability to set up documents held in the Project
Document Registry linked to one or more project milestones as well as the
ability to set a reminder task against the document for follow up by
another WebCert User. The report ‘Incomplete Document Registry’ has also
been updated to reflect this additional information in the report
selection and details reported.
- #539 List
historical certifications in descending order (latest to oldest)
To assist users with particularly longer duration projects, the historical
certifications list will, by default, list the periods in reverse order
with the latest at the top of the list. Users can now also sort this list
on any of the columns shown.
- #562 Unable to
access project details
It was identified that if a user assigned to any project as Project or
Programme Director was deleted then other users were unable to view the
project details. This has now been alleviated by now checking that on
deleting any user, WebCert will check the system to identify if this user
has been set in either of these roles (in the project or programme details
not as user roles in Admin), then that user cannot be deleted.
Issues Resolved
- #597 Deleting
last certification produced error "Could not find Grant
Funding"
A bug that would not permit deletion of the last certification period if
that period was created from uploaded cost details where the project had
been setup with Grant Funding details has been corrected
- #588 Upload of
excel certification fails on "The number of rows do not match to that
of the template" error
The import and upload of certifications has now been updated to improve
the process as well as correcting some minor bugs encountered in system
testing.
- #587 Project
Details report is not sorting cost details into correct grouping for
Budget Summaries and Cost Details
A bug resulting from other updates has now been corrected so this report
correctly reports on project cost data.
- #582 Screen
print of Programme Performance Assessment shows incorrect details in
header
This bug has been corrected
- #580 Report -
Reporting period by Status does not work if you select particular periods.
The ability to select a single or select periods now works correctly
- #578 WPA
performance measure 'To Date Actual Costs' incorrectly shown
The value previously shown was for the current period rather than the
to-date value. This has now been corrected.
- #577 Print
screen to printer is showing scrolling results
A couple of the screens when printed using the WebCert Print icon to print
results directly to the printer were showing scrolled results. This has
now been corrected.
- #576 Cashflow
balances are not refreshing after changing Initial Budget balances in
project details screen
The system has been updated in a number of screens so as to refresh data
as you went to certain other screens. All screens now correctly show the
latest results.
- #575 Error in
period sequencing if Practical Start milestone is adjusted backwards
A problem encountered during system testing identified an issue if a new
project had the date for Practical Start milestone changed to a previous
month. The issue has now been corrected.
- #572 KPI Dial
incorrectly labelled in WPA screen
Fixed
- #570
Refreshing Budget Summary and Cost Details following certification
uploads
Screen is now refreshed immediately to show current results.
- #506 Can we
set the favicon for WebCert 4 domains
WebCert logo now shows on the browser tab to help users identify browser
screens
- #563 Changes
to Forecast Cost on non-provisional variations uploaded from excel are not
reflected in Contingency
A problem with the import and upload of cost details for variations incorrectly
updating the Contingency balance has been corrected.
- #558 Project
Cashflow screen for whole of project not showing refreshed values
Again, after changes in the project cashflow data, we now ensure that all
screens are correctly refreshed to reflect the current data values
- #566 Project
Details report export to excel is not including the project header
We have updated this report as exported to Excel to include the project
details for each project. Previously these had been left off the data
exported.
- #561 Changes
in layout for Consultant Report - Project Cost Report
The Project Cost Report layout has now been updated to provide a more
readable document for Consultant licence users.
Related Articles
27 Sep 2021 System Release 4.3.1-45
Changes and Updates (Effective 27 Sep 2021) Extended functionality Deploy CR [D0113-5] Key Document Linked to Milestone WebCert now provides the ability to set up documents held in the Project Document Registry linked to one or more project ...
11th Oct 2020 - Major system update Release 4.1.0-1
Last night a major update to the WebCErt 4 system was completed to deliver a series of feature enhancements, customisations and bug fixes. The details of the updates applied in Release 4.1.0-1 are summarised below. Change Requests ...
6th April 2021 Release 4.2.0-212
WebCert has released a number of software updates to various modules and reports in response to some problems that have been previously identified. Included in this release, we have also included some minor improvements to various aspects of the ...
26th November 2020 Release 4.2.0-51
This release update included fixes to a number of issues identified with the system along with some changes to existing features to improve the processing and integrity of data held on projects. The following changes were applied in this release. ...
16 June 2021 Release 4.2.0-428
Details of the updates/fixes included in this release are as follows: D999-I145 #522 Project Details screen error in ''Save" logic There was an error that prevented the saving of existing projects subject to the summary item balances set in your ...